1 Defined as a minimum 15.2 SEER2 and 8.1 HSPF2 all-electric heat pump with a variable speed compressor, excluding two-stage compressors, system produces 100% of rated heating capacitywithout backup heat at 17 degrees F, cooling capacity cannot exceed 125% of cooling load at design conditions, and is installed by a manufacturer certified installer. Builder must
Read More »
Category: News
TVA EnergyRight Home Energy Rebates
To take advantage of any of these rebates visit TVA Energy Right. If you have any questions don’t hesitate to contact the CDE Lightband Energy Services professionals. 1 Must be installed by an approved QCN member and meet TVA Standards effective on installation date. All measures, except Window Replacement, eligible for program financing. 2 Must
Read More »
CDE Lightband Saving Money and Energy Information Center
Have you ever wondered why your energy use at home changes from one month to the next, even though your routine at home stays mostly the same? HVAC systems and water heaters account for the majority of the energy used in our homes. Drastic temperature changes will increase the energy use of these devices. To
Read More »
CDE Lightband Electric Vehicle Information Center
According to the Tennessee Valley Authority (TVA), Electric Vehicles (EVs) cost less to operate than gas powered cars, are more environmentally friendly and have some performance advantages. The environmental benefits of EVs are particularly appealing in Clarksville, TN because more than half of the electric power that TVA generates and CDE Lightband sells to customers
Read More »
CDE Lightband Renewable Energy Resource Information Center
Electricity is one of the most carbon friendly energy sources available, and new carbon free sources of electricity are now more available than ever. Photovoltaic panels (solar panels), wind turbines, battery energy storage devices and other technologies commonly referred to as Distributed Energy Resources (DER) have become a more integrated part of electric power delivery.
Read More »
Renewable Generation Interconnection Process
If you are ready to start the process of interconnecting your own distributed renewable generation system to the CDE Lightband distribution system, then please follow this step-by-step guide. Please remember that no distributed generation system can be operated in connection with the CDE Lightband distribution system until all of these steps have been completed.
Read More »
CDE Lightband Power Partner Agreement
Please complete all of the required fields at the bottom of this form. Upon completion, a signed copy of the Power Partner Agreement will be delivered to the email address you provide.
Interconnection and Parallel Operations Agreement for Distributed Generation
Please complete all of the required fields at the bottom of this form. Upon completion a signed copy of the Interconnection and Parallel Operations Agreement for Distributed Generation will be delivered to the email address you provide.